In order to make the drainage PPR pipe more unobstructed, the liquid level measurement shall be carried out before the installation of the drainage pipe. The pipe industry will briefly introduce the application of PPR pipes.
The indoor water supply and drainage construction must be carried out with the cooperation of other professionals. Before the pipeline, check whether the pipeline is blocked by foreign matters. The construction shall be stopped temporarily and the orifice shall be blocked. Prior to PPR pipe installation, holes must be reserved, civil works must be reserved, and supports must be buried. Water supply and drainage pipes shall be installed. It should also be noted that the application of non combustible pipe fittings will be tightly filled through the gap when the firewall passes through the firewall. Flame retardant materials should also be applied to the pipe insulation materials, and hanging brackets should be fixed. Pipe fittings that ensure no pollution, health and safety,
All PPR pipe fittings shall be clearly marked during laying. Remember that PPR pipes should be erected and horizontal pipes should be as close to columns and beams as possible. Installation of PPR pipes should not only be neat and beautiful, but also ensure quality.