What should be paid attention to in the layout of home decoration pipeline?

Aug 17, 2022

What should be paid attention to in the layout of home decoration pipeline?1.About the water pipe laying should go to the top or go to the problem, which depends on the user's own consideration

2. The HOME INSTALLS THE LAYOUT OF CONDUIT, THE MOST BASIC REQUIREMENT IS "HORIZONTAL LEVEL VERTICAL". The advantages are: easy to install elbow, ensure smooth water flow; Facilitate the installation of other parts in the later stage; Easy to protect the line pipe and later maintenance. It is very necessary.

 3. Do not press the water pipe on the circuit pipeline, and do not put the water wire pipe in a groove, otherwise there may be leakage danger. Water and electricity shall be arranged in separate grooves, and the spacing between the two grooves shall be at least 15 cm.

 4. Water pipe and gas pipe must not cross, otherwise it is easy to produce water pipe leakage or gas leakage. The distance between water pipe and gas pipe should be more than 10 cm.

 5. The distance between hot and cold water pipes should be 15cm, and the error should be within 0.1cm. If the specifications are not followed, or the error is too large, the water heater interface will not be connected to the water pipe. The wall thickness of hot and cold water pipe is not the same, cold water pipe can not be used to do hot water pipe, the simple way to distinguish hot and cold water pipe is to have a red line mark on the hot water pipe.

6 as little as possible to use connecting accessories, whether it is under the ground or in the wall, it is best to use as little as possible to connect accessories, the more connection points, the greater the possibility of leakage.

7. Water pressure test must be carried out after the installation of water pipes. Buried IN THE PIPE INSIDE THE WALL IN ADDITION TO BE RESPONSIBLE FOR CONVEYING WATER, in the use of the future even for a long time to accept the test of water pressure, especially conduit connection position is the most easy to withstand the test and leakage. Therefore, all involving the construction of waterways should be carried out pressure test, test the pressure capacity of the pipeline after transformation. Under normal circumstances, pressurization should be carried out before and after waterway transformation to better comprehensively test the bearing capacity of the water pipe and ensure that the pipeline does not leak and is safe to use. This step must not be omitted.